My email jiminysimpson@gmail.com

My email jiminysimpson@gmail.com

Friday, January 8, 2021

New Drainage for Av 19 de Octubre

In the past month, the rainwater collector for Avd. 19 de Octubre has been cleaned and put into Active operation. 

A reinforced concrete adaptable drain has been built at the entrance of the existing collector to filter the fall of materials from the mountains that surround it. This action is intended to end the problems that were caused on the road and the residents of the Zurgena Mirador Building.

No comments:

Post a Comment