Had a good long chatter with Candido this morning re outstanding Public Works issues.

He informed me about the following,

The trees in the area of Jardines de Almanzora 2 will get a strimming next week.

The work to repair Calle Finlandia and others affected by the storm should start in December.

The hold up with the repairs to the street lights has been due to us running out of street light bulbs. These should be back in stock in the next couple of weeks.

The switching on of the new street lights should take place during December/January.

The repairs/cleaning of various streets, already reported, including Calle Carl Von Linneo and the road between Los Llanos and Los Cabreras, should get undertaken in a few weeks. The reason for the delay in doing a lot of this stuff is due to the financial situation, as budgets have not been adhered to, with a consequence being that funds for normal maintenance have been hit!

There are certain streets such as Calle Irlanda and Calle Miguel Hernandez which were surfaced during the works earlier this year which show signs of deterioration due to the sub soil being washed away. This is something that we are hoping to remedy but again was due to a shortage of funds to be able to install pipework, prior to the road surfacing. It was a question of having the surface done or not at that time and the decision was that it would work out cheaper to get them done as part of those works at that time. Regarding Calle Irlanda it is also part of another project to install the pipework to run under this road when other similar works are to be undertaken in December/January.

The bowling green contract with Nila is almost signed off (at long last) and it is hoped that we can then agree a process to hand the green over to a company to complete the infrastructure and run the club. Probably before the end of the year, in the hope that whoever takes it over, can begin opening the green early in the new year.  

We agreed to get the new street plans picked up next week and installed.

Candido explained that the reason that the work to complete the repairs to the dipuradora for Cuesta de los Pinos took over 3 weeks was due to the fact that they discovered that there was a natural water spring underneath the works and they had to install a pipework system to take this water away down the rambla from the works. It is perhaps worthy of mentioning that the new pipework to bring the waste water from Los Llanos del Peral down to this treatment plant should commence in the New Year and this should also alleviate the problem with the standing waste at the bottom of Calle Abderraman 3 and other parts of Los Llanos.

We also had a lengthy discussion about planning for next years local elections due to be held in May. Candido reminded me that we should be looking at involving, anyone from the expat community, who would like to get involved, particularly ladies! So if you, or anyone you know, would consider helping serve their community by getting involved please give it some serious thought. Next years election, as always, will decide the route the Town Hall takes over the next four years. It is my intention to take  a much less involved role, so I really hope some of you will consider serving otherwise we may have no real representation in the next administration. Should you wish to know more or to express an interest please drop me an email or give me a ring

Lastly a reminder to all our community of the Royal British Legions service to be held this year in the Renfe building and is is requested that those attending to please be in their seats by 1030am on Tuesday the 11th November. The Town Hall has obtained, prepared and installed a new memorial marble plinth in the garden opposite the Renfe as a focus for our remembrances.